St Pauls Catholic Primary School, Thames Ditton – RAAC Remediation M&E Enabling Works

Explore the project
ClientSt Pauls Catholic Primary School, Hampton Court, Thames Ditton
Duration11 Weeks
Building usePrimary Education
Project scopeRAAC Removal MEP Works

St Pauls Catholic Primary School, Thames Ditton — mechanical, electrical and alarm services enabling and reinstatement works supporting the installation of structural steel reinforcement to failing RAAC planks. Completed two weeks ahead of programme.

Working inside somebody else’s programme

Reinforced autoclaved aerated concrete (RAAC) has taken a number of school buildings out of use at short notice. Where planks are failing, the remediation is structural — but almost none of it can start until the building services running through the affected areas have been dealt with.

At St Pauls, a building contractor was appointed to install steel reinforcement supporting the failing planks in the school’s corridors. ComGas worked alongside them, responsible for the safe isolation and strip-out of all mechanical and electrical services in the affected areas, and for putting everything back afterwards.

The new steel supports sit approximately 100mm from the load-bearing wall. That dimension governed the whole M&E scope: every service running at high level through those corridors had to be moved clear of it and then returned to service.

Temporary propping beneath the affected ceiling planks, with the heating main routed clear of the new steel support
Temporary propping beneath the affected planks, with the heating main set out clear of the new steel support.

Mechanical: heating and domestic water services

  • Existing hot and cold domestic water services running at high level within corridors and WCs were isolated and adjusted as necessary to suit the new steel installation
  • Existing carbon steel LTHW heating flow and return services were adjusted as required to suit the proposed steel installation
LTHW flow and return pipework with identification banding running at high level beneath a corridor rooflight
LTHW flow and return running at high level, banded and labelled, clear of the new steelwork.
Heating pipework routed at high level above fitted storage cupboards
Heating pipework routed at high level above fitted storage.

Electrical: containment and wiring

  • Existing electrical containment within the corridors was adjusted to suit the installation of the new steel supports
  • Wiring was removed or adjusted as necessary to enable the steelwork to be installed
Corridor heating pipework and cable containment reinstated at high level alongside the new steel
Cable containment and heating pipework sharing the same high-level route through the corridor.
Close view of high-level pipework turning a corner above a corridor partition
Containment and pipework turning at high level where the corridor changes direction.

Alarm services

  • Existing fire alarm cabling and components within the corridor were adjusted and modified to suit the new steel installation
  • Existing intruder alarm cabling and components within the corridor were adjusted and modified to suit the new steel installation
Corridor lighting and detection devices reinstated below high-level pipework
Lighting and detection reinstated below the new high-level pipework route.
Corridor services with emergency lighting and a wall radiator returned to use
Corridor services back in use, with emergency lighting and wall radiators returned to service.

Reinstatement

Following the steelwork, ComGas reinstalled all services to full working order — water services, heating flow and return, electrical containment and wiring, and the fire and intruder alarm systems serving the corridors.

The value of the enabling contractor on a job like this is measured in how little the structural team has to wait. The project completed two weeks early, allowing the main contractor to hand over and the school to return staff and pupils to their classrooms ahead of schedule.

Heating pipework set out in an offset above a corridor doorway to clear the new steel
Pipework set out in an offset above a doorway to pass the new steel support.
Domestic water and heating services reinstated at ceiling level in a school WC area
Domestic water and heating reinstated at ceiling level in the WC areas.

Corridors and classrooms back in use

With the steelwork complete, the corridors and classrooms were handed back with every service working again: heating flow and return, hot and cold water, electrical containment and wiring, and the alarm systems serving the affected areas.

Reinstated corridor services beneath a rooflight after the steel reinforcement was completed
Reinstated corridor services beneath the rooflights.
Completed school corridor with heating pipework, containment and lighting reinstated at high level
The finished corridor: heating, containment and lighting all running clear at high level.
Classroom ceiling at St Pauls Catholic Primary School after completion, with new steel support and reinstated high-level services
A classroom ceiling after completion, with the new steel and the reinstated services in place.

Why this scope needs one contractor

The scope crossed four disciplines — domestic water, heating, electrical, and alarm systems — in the same short stretch of corridor, on the same programme, against the same steel. Split across separate specialists it becomes a coordination exercise with several parties waiting on each other.

ComGas covers mechanical and electrical services under one appointment, which is why this kind of multi-discipline enabling package sits naturally with us. It is a recurring requirement in the education estate as RAAC surveys and remediation programmes continue.

ComGas has also carried out a separate plant room refurbishment at the same school: St Pauls Catholic Primary School — boiler and water heater replacement.

Plan your next project

Planning school building-services works?

Talk to ComGas

Looking for a reliable commercial engineering partner?

Current accreditations and registrations.

Quick office contact

Prefer WhatsApp?

Message the ComGas office on 01252 214120.

WhatsApp our office