Send CofE Junior School, Woking – Plant Room & Condensing Boiler Replacement project photograph
EducationPlant Room Refurbishment

Send CofE Junior School, Woking – Plant Room & Condensing Boiler Replacement

Explore the project
ClientSend CofE Junior School, Woking
Duration3 Weeks
Building usePrimary Education
Project scopePlant Room Refurbishment

Send CofE Junior School, Woking — replacement of the school’s main plant room within a three-week programme, covering gas service alterations, new gas-fired condensing boilers, a designed flue system, new controls, and weatherproofing of the flat roof around the new flue.

A three-week window

Replacing the heating plant in a school is governed as much by the calendar as by the engineering. The heating has to be out of service while the old plant is removed and the new plant is installed, and it has to be back in service, cleansed and commissioned before the building is occupied again. At Send CofE Junior School the whole replacement was programmed into three weeks.

That window shaped the sequence. Strip-out and disposal of the existing plant room equipment, alterations to the incoming gas service, installation of the new boilers and plant, cleansing, commissioning and the builders work around them all had to be planned as one continuous operation rather than as separate visits.

Send CofE School plant room with insulated heating pipework, Grundfos circulating pumps, and pressure gauges.
Insulated heating flow and return pipework with twin Grundfos circulating pumps and pressure gauges.

Designed as well as installed

ComGas was responsible for the design of two elements of this project as well as their installation: the flue system and the controls.

Moving to gas-fired condensing boilers changes what a flue has to do. Condensing plant operates at lower flue-gas temperatures and produces condensate, so a flue that served earlier non-condensing boilers is rarely suitable to be carried over. A new flue system was designed for the replacement boilers and installed as part of the same package.

The control strategy was designed alongside it. That matters on a plant room replacement, because it is the difference between new boilers commissioned as a complete system and new boilers left working against control equipment inherited from the plant they replaced.

Wall-mounted digital system controls, red expansion vessel, and plate heat exchanger in the Send school plant room.
Wall-mounted digital control units above the plate heat exchanger and red expansion vessel.

Scope of works

  • Strip-out and disposal of the existing plant room equipment
  • Modifications to the existing gas service
  • Installation of new gas-fired condensing boilers
  • Design and installation of a new flue system
  • Installation of new plant room equipment
  • Design and installation of new controls
  • Pre-commission cleansing
  • Testing and commissioning
  • Builders work in connection with the mechanical installation
  • Making good and weatherproofing of the flat roof around the flue
  • Provision of record documentation
Plate heat exchanger with black insulated connections, yellow dirt separator, and motorised valve on insulated pipework.
Plate heat exchanger, dirt separator and motorised valve connected to insulated heating pipework.
Yellow gas pipework with a solenoid shut-off valve mounted to the wall beside vertical heating flow and return pipes.
Gas supply pipework with safety solenoid valve routed beside vertical heating flow and return pipes.

Finishing the roof rather than leaving it

A new flue has to pass through the building envelope, and at Send that meant a penetration through a flat roof. Making good and weatherproofing around it was carried out by ComGas within the mechanical package rather than passed to a following trade.

For the school that means one contractor is accountable for the roof being weathertight, and there is no gap in the programme between the flue being installed and the roof being finished. The associated builders work in connection with the mechanical installation was handled the same way.

Handover

The system was cleansed before commissioning, then tested, commissioned and handed over with record documentation for the school to keep alongside its other building records.

Work of this kind sits within the commercial plant room installations ComGas carries out for schools and academy trusts, where the programme is normally fixed by the school calendar rather than by the works. Plant of this kind is also covered by our planned service and maintenance.

From the outset, their professionalism and expertise were evident. The team demonstrated a deep understanding of the complexities involved and provided a comprehensive solution tailored to the specific needs of our plant room.

Throughout the project, Comgas maintained clear communication, ensuring that all deadlines were met and that the disruption to the school’s daily operations was kept to a minimum. Their commitment to quality workmanship and attention to detail was outstanding, resulting in an efficient, safe, and well-organized plant room that exceeded our expectations.

Site Manager, Send C of E School, Woking
Send C of E School, Woking
Plan your next project

Planning school building-services works?

Talk to ComGas

Looking for a reliable commercial engineering partner?

Current accreditations and registrations.

Gas Safe Registered OFTEC Registered REFCOM F-Gas Certified CHAS Accredited Constructionline Approved
Quick office contact

Prefer WhatsApp?

Message the ComGas office on 01252 214120.

WhatsApp our office