Where more than a single hired boiler is needed to keep a building warm during a full plant replacement, extended works or an unplanned failure, ComGas can assess your site and co-ordinate a broader interim heating strategy alongside the main project. Scope and availability depend on survey and the arrangements confirmed at the time.
Interim heating, considered as a project in its own right
Some situations need more than one hired boiler.
A single temporary boiler is often enough to bridge a short gap. But where a building is undergoing a full plant replacement, a longer refurbishment, or has lost heating across multiple zones or buildings, the interim arrangement needs to be considered as a project of its own — covering distribution around the site, connection points, and how the temporary provision will be phased alongside the main works.
ComGas can assess a site facing this kind of situation, discuss what interim heating strategy may be achievable, and co-ordinate the temporary arrangement alongside a planned boiler or plant replacement project. As with a single temporary boiler, we do not operate our own hire fleet and do not guarantee stock, a fixed delivery timescale or continuity of supply — what is achievable depends on a site assessment and the arrangements confirmed at the time.
ComGas Services UK Ltd Temporary heating co-ordination from Farnham, Surrey.
Temporary heating solution services
Assessment, co-ordination and phased delivery of an interim heating strategy.
For larger or longer situations than a single hired boiler can cover, we can help plan and co-ordinate the interim arrangement alongside your main project.
Site & Project Assessment
Assessing the scale of heating loss across the building or site, and how it relates to the timescale of the main boiler or plant project.
Assessment across multiple zones or buildings where relevant
The right interim approach depends on the scale of the project.
Before proposing anything, we look at how much of the building or site is affected, how long the main project is expected to take, what distribution and connection points exist, and where interim provision could realistically be sited without disrupting the main works. Where the main project is being delivered in phases, the interim heating strategy is considered alongside that phasing rather than as a single fixed arrangement.
This assessment shapes what is proposed and how it is phased. As with any interim arrangement, we explain honestly what is achievable for the specific project rather than assuming a standard solution will fit every situation.
Scale of heating loss assessed across the site
Main project timescale and phasing considered
Distribution and connection points reviewed
Practical siting options identified for interim provision
Access and safety considerations reviewed alongside the main works
Recommendation explained clearly before proceeding
A broader interim strategy still depends on what can be confirmed at the time.
As with a single temporary boiler, ComGas does not own a hire fleet and does not have an exclusive arrangement with a single hire provider. What interim heating provision can be arranged for a larger project, and how it is phased, depends on a site assessment and on the arrangements that can be confirmed once the requirement is understood. We set this out clearly so it can be planned around realistically, alongside the main project timescale.
No hire fleet is owned or guaranteed by ComGas
No single exclusive hire-partner arrangement is assumed
Interim provision confirmed by assessment, not promised in advance
Phasing agreed alongside the main project programme
Continuity depends on what has actually been arranged
Scope, specification and availability for a temporary heating solution are confirmed following a site assessment and depend on what can be arranged at the time. No delivery timescale, stock level or continuity of supply is guaranteed in advance of that assessment.
Genuine reviews from ComGas customers, submitted through Google.
Posted on Google
Ricky Matthews
5 October 2026
Trustindex verifies that the original source of the review is Google.
I'm the site Manager at St Paul's primary school and we have used ComGas for a whole refit of our water pipes. They was brilliant excellent friendly team never left a mess and the pipe work is so neat and tidy very professional work. We Also had an issue with our school Kitchen gas interlock system I called on Thursday morning they was there checking it over and parts ordered and fixed by Monday morning definitely recommend this company for any of your works especially in schools.
Posted on Google
steve brown
5 October 2026
Trustindex verifies that the original source of the review is Google.
Comgas fit our central heating system six years ago and made a fantastic job of it .They have serviced it regularly every year ever since .
Matt has done the last two services for us and he is very thorough, he rectified a couple of small issues with the rads and is always pleasant and informative. He advices us of what he’s done and what he thinks will be required on our next years service.
We are happy to continue with their services and have found all the guys to be reliable and trustworthy.
Posted on Google
Julia Walker
30 September 2026
Trustindex verifies that the original source of the review is Google.
Paul Pharo turned up on an emergency,within minutes he gave us so much reassurance to a burst hot water pipe isolated went and got new parts and had the penthouse back up with hot water with minimal damage..
can’t thank him enough and the company Comgas
Posted on Google
Ian Chevalier
30 September 2026
Trustindex verifies that the original source of the review is Google.
First time we've used this company and it won't be the last. Very professional and efficient in everything they do and Matt was excellent in his knowledge and efficiency when dealing with our gas and plumbing problems.
Posted on Google
Kerryann Wood
25 September 2026
Trustindex verifies that the original source of the review is Google.
Really happy with the service! Matt came out to carry out our boiler service and was friendly, professional and did a great job. The office team were also lovely and really helpful when arranging everything. Would definitely recommend and use them again. Thank you!
Posted on Google
Rob Haynes
14 September 2026
Trustindex verifies that the original source of the review is Google.
Great service and the work completed in good time and professional company
Posted on Google
Ian Melville
11 September 2026
Trustindex verifies that the original source of the review is Google.
Boiler service today engineer Matt on site, again great job very thorough clean and polite would recommend Comgas very professional outfit lovely staff. 👍🛠
Posted on Google
Bazmac
8 September 2026
Trustindex verifies that the original source of the review is Google.
We use Comgas for our gas and water and Matt does a monthly check on the systems.
Always a pleasure do deal with.
Chloe in their office is really helpful with all enquiries
Barry
Nower House
Posted on Google
Lynn Brooks
8 September 2026
Trustindex verifies that the original source of the review is Google.
Highly recommend. I think the engineers name was Matt, came to service my boiler, friendly and got on with the job quickly and efficiently.
Rated 5.0 out of 5 from 75 Google reviews.
"Really happy with the service! Matt came out to carry out our boiler service and was friendly, professional and did a great job."
Kerryann, Google review, September 2026
"First time we've used this company and it won't be the last. Very professional and efficient in everything they do…"
Ian, Google review, June 2026
"…ended up coming to my place of work and sorting an old heating system that hadn't worked for years in a car showroom & workshop. Great team of guys"
How is this different from a single temporary boiler?
A single temporary boiler, covered on our Temporary Boiler Hire page, suits a straightforward gap in provision. This page covers a broader interim heating strategy — needed where more of the building or site is affected, or where the interim arrangement needs to be phased alongside a longer plant replacement project.
Can you provide interim heating across multiple zones or buildings?
We can assess the scale of heating loss across a site and discuss what interim strategy may be achievable, including how any provision would be distributed. What can actually be arranged depends on the site assessment and the connections and access available.
Do you guarantee a fixed timescale for interim heating provision?
No. As with a single temporary boiler, we do not promise a fixed delivery or continuity guarantee in advance. What is achievable, and how it can be phased, is confirmed once we have assessed your site and the wider project timescale.
Can interim heating be phased alongside a plant replacement project?
Yes. Where a main boiler or plant replacement project is being delivered in stages, the interim heating strategy is planned alongside that phasing, rather than treated as a single fixed arrangement for the whole project duration.
What happens once the main heating project is complete?
The interim arrangement is removed and normal operation is handed back to the permanent installation, co-ordinated with the team delivering the main boiler or plant replacement project.
Planning a plant replacement or facing widespread heating loss across a site?
Tell us about the building, the scale of the heating requirement and the timescale for the main project. We can arrange a site assessment and discuss what interim strategy may be achievable.
We use essential cookies to run this website. With your permission, we’ll also use Google Analytics and page-speed measurement to improve it, and show a Google map on our Contact page. You can change your choice at any time in ‘Cookie settings’. Cookie policy