Care & HealthcareCommercial Boiler Replacement Project

Hatch Mill Care Home, Farnham, Surrey – Commercial Boiler Replacement

Explore the project
ClientAbbeyfield Hatch Mill Care Home, Farnham, Surrey
Duration1 Week
Building useCare Home
Project scopeCommercial Boiler Replacement Project

Abbeyfield Hatch Mill Care Home, Farnham, Surrey — replacement of the boiler plant with a new cascade arrangement, plantroom refurbishment and integration with the existing LTHW system, completed within one week in an occupied care home.

One week, and the building stays warm

A care home is the least forgiving environment for heating works. Residents are in the building continuously, many are vulnerable to cold, and heating and hot water are not services that can be suspended while plant is replaced.

The Hatch Mill boiler replacement was delivered in one week. That programme was not chosen for speed on its own — it was chosen because every additional day is another day of temporary arrangements in a home full of residents. Works were phased to maintain heating and hot water throughout, with temporary provision put in place where it was needed.

Three existing modular boilers in steel frames with service notes on front casings prior to removal.
Floor-standing commercial boilers in steel frames before removal and replacement at Hatch Mill.
Rear and framework of the existing commercial boiler installation and pipework before replacement.
Galvanised framework, flanged valves and insulated pipework prior to plantroom strip-out.

Why a cascade arrangement

The new plant is configured as a cascade — several smaller boilers operating together as one heat source rather than a single large unit.

That configuration matters particularly in care. A cascade matches output to demand, so the plant is not running a large boiler at low load through a mild afternoon. More importantly it builds in redundancy: if one boiler in the cascade is out of service, the others continue to carry the building. In a residential care setting the ability to keep heating and hot water running while a fault is attended to is a resilience requirement, not an efficiency one.

A prefabricated low loss header and distribution pipework were installed to connect the new plant to the existing LTHW heating circuits.

Baxi commercial boilers mounted in a cascade arrangement on a black steel frame at Hatch Mill.
Baxi commercial boilers installed in a cascade arrangement on a steel mounting frame.
Black low loss header connection to red painted distribution pipework fitted with lever isolating valves.
Low loss header and manifold connections joined to red distribution pipework with isolating valves.

Scope of works

  • Strip-out and disposal of the existing boilers and redundant plantroom equipment
  • Supply and installation of new high-efficiency commercial boilers in a cascade arrangement
  • Installation of prefabricated low loss header and distribution pipework for the LTHW heating circuits
  • Modifications and connections to existing plantroom pipework including flow and return integration
  • Installation of new flue systems and condensate discharge pipework
  • Integration with the existing pumps, controls and distribution systems
  • Pipework insulation
  • Associated electrical works to support the new plant
  • Full system flushing, water treatment and commissioning prior to handover
Plantroom concrete plinth cleared after strip-out works, showing painted floor and retained pipework.
Cleared plantroom plinth and painted floor following strip-out of the redundant boiler equipment.
Close-up of red steel heating pipework with Boss lever isolating valves, dial gauges and press-fit copper pipe.
Red distribution pipework fitted with Boss lever isolating valves, dial gauges and copper connections.

Working in an occupied care setting

Risk assessments and method statements covered every stage, with particular attention to resident safety, access control and safe working practices. Close liaison with the home’s management determined when plant areas were worked on and how operatives moved through the building.

Integrating with the existing pumps, controls and distribution — rather than replacing them — kept the intervention contained to the plantroom and shortened the period during which the home was reliant on temporary arrangements.

An operative working on the open heat exchangers and electrical control panels of the boiler cascade.
Operative assembling the boiler cascade with internal heat exchangers and control panels exposed.

Outcome

The new plant was commissioned and integrated with the existing system, and the home was left with boiler plant that carries redundancy it did not previously have.

Boiler and plant replacement in occupied buildings sits at the centre of the commercial heating work ComGas delivers for the care and healthcare sector, where continuity of service governs how the works are planned. Plant of this kind is also covered by our planned service and maintenance.

Rear of the boiler cascade with rotary electrical isolators, flexible conduit and black condensate drainage pipework.
Rotary electrical isolators, flexible conduit and condensate pipework at the rear of the cascade.

“ComGas recently completed the boiler replacement project at Hatch Mill Care Home, and we were extremely pleased with both the process and the end result. Working within a live care environment is never straightforward, but the team managed the project professionally, ensuring minimal disruption to our residents and staff throughout.

The installation was carried out efficiently and to a high standard, with clear communication at every stage. The new boiler system has already made a noticeable difference in reliability and overall performance. It was particularly important to us that services were maintained at all times, and ComGas delivered on this without compromise.

I would have no hesitation in recommending ComGas for similar projects where quality, coordination and consideration for occupied buildings are essential.”

JackFacilities Manager, Abbeyfield Wey Valley Society
Abbeyfield Wey Valley Society
Plan your next project

Need to replace ageing plant in an occupied building?

Talk to ComGas

Looking for a reliable commercial engineering partner?

Current accreditations and registrations.

Quick office contact

Prefer WhatsApp?

Message the ComGas office on 01252 214120.

WhatsApp our office