South Farnham School. Farnham, Surrey

  • Client South Farnham School. Farnham, Surrey
  • Project Duration 3 Weeks
  • Building Use Primary Education
  • Project Use Kitchen Ventillation & Ductwork

Project Overview

The existing ventilation equipment was in allowing water ingress into the ductwork and it was leaking into the kitchen area via the canopy.

Strip Out

  • The equipment was isolated, the PIB (rubber) weather protection and insulation was removed and disposed of..

Ductwork

  • New ductwork was manufactured and our engineers installed new replacement ductwork.
  • All joints were resealed with new Butyl Gaskets to ensure the soundness of the ductwork.
  • The ductwork was then thermally insulated with a 40mm Kingspan Thermaduct boards.
  • The boards were taped, glued and sealed into position and finished with Gloss Black Pro clad 150TM to match materials already installed on the ductwork sited on the above roof.