South Farnham School, Farnham – Kitchen Extract Ductwork Replacement

Explore the project
ClientSouth Farnham School, Farnham, Surrey
Duration3 Weeks
Building usePrimary Education
Project scopeKitchen Ventilation & Ductwork

South Farnham School, Farnham, Surrey — replacement of external kitchen extract ductwork after failed weather protection allowed water into the ductwork, which was then leaking into the kitchen through the extract canopy. Completed in three weeks.

Vertical kitchen extract ductwork clad in gloss black sheeting on an exterior brick wall at South Farnham School.
Gloss black clad extract ductwork with access doors rising up the external brick elevation.

The symptom was in the kitchen. The fault was on the roof.

Water was entering the school kitchen through the extract canopy. A canopy leaking water is an immediate problem in a food preparation area, and one that has to be resolved rather than managed.

The cause was not the canopy. The external weather protection and insulation on the ductwork serving it had failed, allowing water into the ductwork itself. Once inside, the ductwork carried it down and it appeared at the canopy — the lowest point and the only place anyone could see it.

This is a common pattern with external ductwork. The visible symptom is often a long way from the defect, and repairing at the point where water appears does not stop it.

Pool of water inside an open galvanised steel duct section with vertical turning vanes and torn insulation below.
Standing water collected inside the galvanised ductwork base beside internal turning vanes.
Broken insulation board fragments, foil tape and damaged black membrane surrounding a duct base on the roof.
Deteriorated external insulation and torn weather protection membrane at the roof duct base.
Removed ductwork section with access hatch on the flat roof in front of black-clad ventilation plant.
Dismantled duct section on the flat roof with existing extract plant visible in the background.

Strip-out

The equipment was isolated, and the PIB rubber weather protection and insulation were removed and disposed of. That exposed the condition of the ductwork underneath and confirmed the extent of the replacement required.

An operative in high-visibility vest dismantling external ductwork outside a doorway at South Farnham School.
Operative dismantling external extract ductwork on the brick elevation during the strip-out.
Stripped-out metal ductwork sections flanking a white glazed doorway and steps against external brickwork.
Ductwork risers partially stripped down around the exterior door opening before replacement.
Top view of a stripped ductwork section with access hatch, peeling foil tape and damaged insulation on the roof.
Removed ductwork component with access hatch showing degraded foil-faced insulation and tape.
Rusted metal ductwork section with square access door lying on flat roof membrane among loose insulation fibres.
Corroded ductwork section removed on the flat roof with degraded insulation clumps around it.

New ductwork

New ductwork was manufactured and installed by our engineers. All joints were resealed with new butyl gaskets to ensure the soundness of the ductwork — on a kitchen extract system, joint integrity is what keeps grease-laden air inside the duct and rainwater outside it.

The ductwork was then thermally insulated with 40mm Kingspan Thermaduct boards. The boards were taped, glued and sealed into position, then finished with Gloss Black Pro clad 150TM to match the materials already installed on the ductwork on the roof above.

Matching the existing finish mattered here. The ductwork is visible, and a repair in a different material reads as a patch for the life of the installation.

Newly installed galvanised steel kitchen extract ductwork with clean access doors on an external brick wall.
New galvanised rectangular ductwork with sealed access doors erected on the brick elevation.
Twin uninsulated galvanised ductwork risers flanking an exterior door with an access ladder beside the parapet.
Full-height galvanised ductwork risers installed around the doorway prior to thermal lagging.

Delivering it around a working school kitchen

A school kitchen cannot stop for three weeks. The extract system serving it has to be back in service for the kitchen to operate, which sets the programme for work of this kind regardless of how much ductwork is involved.

Straight-on view of gloss black weatherproofed extract ductwork with silver inspection hatches beside doorway steps.
Completed gloss black clad ductwork flanking the kitchen access doorway and external steps.

Scope of works

  • Isolation of the existing equipment
  • Removal and disposal of the PIB rubber weather protection and insulation
  • Manufacture and installation of new replacement ductwork
  • All joints resealed with new butyl gaskets
  • Thermal insulation with 40mm Kingspan Thermaduct boards, taped, glued and sealed
  • Finished with Gloss Black Pro clad 150TM to match the existing rooftop ductwork

Kitchen extract systems sit within the commercial ventilation and HVAC work ComGas carries out, and specifically within our commercial kitchen and catering capability. Ductwork of this kind is a recurring requirement across the education estate, where kitchens run to a fixed daily timetable.

Angled view of insulated extract ductwork in a gloss black finish with silver access panels and airflow arrows.
Weatherproof gloss black ductwork with access panels and airflow directional labelling.
Plan your next project

Planning school building-services works?

Talk to ComGas

Looking for a reliable commercial engineering partner?

Current accreditations and registrations.

Quick office contact

Prefer WhatsApp?

Message the ComGas office on 01252 214120.

WhatsApp our office