Brightwells Yard, Farnham – Commercial Unit Plumbing & Mechanical Fit-Out

Explore the project
ClientWaverley Borough Council, Farnham, Surrey - Commercial Plumbing & Mechanical Installation
Duration1 Week
Building useCommercial Retail Space
Project scopeMechanical Works

Brightwells Yard, Farnham, Surrey — commercial plumbing and mechanical installation within commercial units at the town-centre regeneration development, covering hot and cold water services, WC facilities, hot water systems and associated drainage pipework, delivered under the main contractor’s fit-out programme.

Brick elevation and glazed ground-floor commercial unit frontages at Brightwells Yard in Farnham.
Commercial unit frontages and brick elevation at the Brightwells Yard development.

Fit-out runs to somebody else’s clock

Brightwells Yard is a town-centre regeneration scheme, and the building services within it were delivered as part of a wider construction programme run by the main contractor, Premier Design & Construction.

That changes how a plumbing package is delivered. The programme is not set by the mechanical works — it is set by the sequence of the fit-out across the development. First fix has to be complete before finishes; second fix cannot start until other trades have finished in the same space; and the units do not all reach the same stage at the same time.

ComGas worked across multiple commercial spaces, moving between them as each reached the point where mechanical works could proceed.

Old Market Place wayfinding totem sign standing outside a glazed ground-floor commercial unit.
Wayfinding signage outside glazed commercial shopfronts in Old Market Place.
Ground-floor commercial shopfront with full-height glazing and upper-storey brick facade.
Glazed commercial frontage and red brick elevation during unit fit-out works.

Scope of works

  • Installation of domestic hot and cold water services throughout the commercial units
  • Fit-out of customer and staff WC facilities including sanitaryware, pipework and associated systems
  • Installation of hot water systems serving the welfare areas
  • First fix and second fix plumbing works across multiple commercial spaces
  • Installation of waste and drainage pipework systems serving the WC and washroom areas
  • Coordination with the main contractor and other trades throughout the fit-out programme
  • Testing, commissioning and certification of the installed plumbing and mechanical systems
Exposed high-level copper pipework installed at ceiling level in a commercial unit.
Overhead copper pipework routed at high level through the commercial unit.

Customer-facing and back-of-house

Commercial units carry two standards of finish in the same building. Customer WCs are seen by the public and are judged accordingly. Staff welfare areas and back-of-house services are not, but they carry the same compliance and testing requirements and are usually the parts that have to work hardest.

Both were within the scope here, along with the waste and drainage pipework serving them.

Accessible washroom with toilet, support grab rails, hand basins, copper supply pipework and white waste pipework.
Accessible WC facility with sanitaryware, grab rails, exposed copper pipework and waste services.

Testing and certification

All installed plumbing and mechanical systems were tested, commissioned and certified. On a fit-out this is the point at which the package is handed to the main contractor rather than to the end occupier, so the documentation has to satisfy the construction programme as well as the building.

Work of this kind falls within ComGas’s commercial plumbing capability, including commercial hot water systems, delivered on construction and fit-out programmes across Farnham and the surrounding area.

Plumbing beneath a washbasin showing copper pipework with isolating valves, drain-off points and a white bottle trap.
Under-basin pipework showing isolating valves, drain-off points, bottle trap and waste connections.
Plan your next project

Planning mechanical works on a development or fit-out?

Talk to ComGas

Looking for a reliable commercial engineering partner?

Current accreditations and registrations.

Quick office contact

Prefer WhatsApp?

Message the ComGas office on 01252 214120.

WhatsApp our office