ComGas assesses incoming electrical supply, designs distribution and installs commercial EV charge points for offices, schools, industrial sites and other commercial buildings across Surrey and surrounding counties. Every scheme starts with the supply, not the charger.
Load management as an alternative to a costly upgrade
Workplace, fleet, visitor & tenant use cases
BS 7671-compliant design & certification
The charger is rarely the constraint on a commercial site
The incoming electrical supply usually decides what is possible, not the charge point.
A commercial EV charging installation looks, on the surface, like a straightforward job of fixing units to a wall or a bollard and running cable to them. In practice the charge points themselves are the easy part. The question that actually determines what a scheme can achieve — how many bays, how fast, and over what timescale — is whether the building's incoming electrical supply has the spare capacity to support it, and if not, what the alternatives are.
Specify charge points before answering that question and you risk a scheme that cannot be energised as designed, an unplanned request to the local Distribution Network Operator with a lead time outside anyone's control, or a supply upgrade that makes the whole project uneconomic. Get the sequence right and there is often a way to deliver a workable number of bays now, using load management, with the containment and capacity in place to add more later without repeating the groundworks. This applies equally whether the driver is workplace charging for staff, a fleet depot, or charging offered to visitors and tenants.
ComGas assesses existing supply and site constraints before proposing a charging scheme, and designs, installs and certifies the distribution, charge points and associated groundworks for offices, schools, industrial units and other commercial buildings across Surrey, Hampshire and Berkshire, coordinating this work with wider electrical or car park projects where relevant.
ComGas Services UK Ltd Commercial EV charging installation from Farnham, Surrey.
Commercial EV charging services
Supply assessment, installation, groundworks and ongoing maintenance, covered as one scope.
We assess what the incoming supply can support before any charge point is specified, and stay involved through installation, certification and maintenance.
Supply & Capacity Assessment
Reviewing incoming supply capacity, existing maximum demand and spare capacity before any charge point is specified.
Maximum demand assessment against existing and proposed load
Spare capacity identified before charger selection
DNO application requirements identified early, where relevant
Load management modelled as an alternative to a supply upgrade
How we approach a commercial EV charging installation
Assess the supply, confirm the use case, design distribution, install, then commission and certify.
We start with an assessment of the incoming supply and existing maximum demand, because this determines everything that follows. In parallel, we establish the use case — workplace charging for staff vehicles, fleet charging with defined return times, visitor charging with shorter dwell times, or tenant charging with individual billing — since each drives a different number of bays, charging speed and access control requirement.
Once the supply position and use case are confirmed, we design the distribution, containment and any load management required, sequence the groundworks around the operational site, and install and commission the charge points. Earthing arrangements and PEN fault protection are assessed as part of the design, since EV charging installations carry specific requirements under BS 7671 that a general electrical installation does not. Every installation is certified to BS 7671 on completion, with the paperwork and test results handed over as part of the scope.
Incoming supply and maximum demand assessed before design
Use case established: workplace, fleet, visitor or tenant charging
Load management designed in where a supply upgrade is not viable
Distribution and groundworks sequenced around site operations
Charge points installed, commissioned and load-tested
Certification and test results issued to BS 7671 on completion
What we consider before any EV charging installation
Spare supply capacity and car park access shape what a scheme can deliver.
Spare capacity on the incoming supply is usually the first constraint, and where it is insufficient we consider whether a DNO application for additional capacity is justified against the timescale it involves, or whether dynamic load balancing across the proposed bays can deliver a viable scheme without it. Car park layout, existing surfacing, cable routes and reinstatement, and how the site continues to operate during groundworks all shape the practical delivery of the scheme, alongside access control and any billing requirement for tenant or visitor use. Back-office systems for access control, RFID identification and usage billing are considered alongside the physical installation, since these determine how the charge points are actually managed once live, particularly where tenants or visitors are billed separately from staff.
Spare supply capacity confirmed before bay numbers are agreed
DNO application lead times understood as outside our control
Car park groundworks, reinstatement and cable routes planned
Load management considered before committing to a supply upgrade
Access control, RFID and usage billing requirements identified
Containment and capacity for future bay expansion built in now
Every EV charging scheme is scoped to the site's actual supply position and use case. We confirm what is achievable now and what can be added later before any charge point is specified.
Who we work with
Commercial EV charging installations for a range of building types.
What customers say about our commercial EV charging installation work.
Genuine reviews from ComGas customers submitted through Google.
Posted on Google
Nick
3 September 2026
Trustindex verifies that the original source of the review is Google.
Matt from ComGas Services UK Ltd was very professional, polite, friendly and quick installing a new shower in my bath (and at a better height for me) and a much easier press-in plug for my sink! He left the place spotless. This is the kind of service and installation people dream about - a 5 star service (see photos).
Posted on Google
Laura Peters
17 August 2026
Trustindex verifies that the original source of the review is Google.
I have used Comgas twice and both times have been very happy with the service. Very friendly and honest. The most recent time, the job turned out to be a lot bigger than they initially thought but it was no issue and Paul stayed the extra time to make sure the job was done properly! He was really tidy, took a lot of care with the work that was done and took the time to explain what he was doing and why. Pleased to have found a reliable heating company!
Posted on Google
James Ross
8 August 2026
Trustindex verifies that the original source of the review is Google.
I had an issue with my boiler and Matt came out to have a look the same day and managed to fix it. Great, professional service. Highly recommend.
Posted on Google
Ian Chevalier
11 June 2026
Trustindex verifies that the original source of the review is Google.
First time we've used this company and it won't be the last. Very professional and efficient in everything they do and Matt was excellent in his knowledge and efficiency when dealing with our gas and plumbing problems.
Posted on Google
Karen Flackett
20 May 2026
Trustindex verifies that the original source of the review is Google.
Excellent service. Matt came & fitted 2 taps & waste pipes he was polite & friendly & carried out the work efficiently & in a timely manner.
Posted on Google
Paul Norris
30 April 2026
Trustindex verifies that the original source of the review is Google.
Fantastic experience from the chaps at ComGas! Special thanks to Matt who removed an old boiler and replaced with a new energy efficient to satisfy the demands of a five bed house with a few bathrooms/baths and showers. The ComGas admin team and Lee were fantastic too on the booking and administration side of things!
Posted on Google
Julie Galvin
21 April 2026
Trustindex verifies that the original source of the review is Google.
Here at St Joseph's we have worked with Comgas for a number of years. They have completed big projects and undertake regular maintenance for our school. They price fairly, and their work is completed to a very high standard. All the engineers carry a DBS which makes life so much easier when trying to book an engineer visit.
On the rare occasion that we have an emergency I can trust that Lee will get one of his engineers to respond quickly and efficiently.
Nothing is too much trouble and no job is too small.
Posted on Google
Chesca Haley
16 April 2026
Trustindex verifies that the original source of the review is Google.
Lee and the team are amazing! So helpful, so knowledgeable and really look after their customers. Highly recommend.
Posted on Google
Sarah Rogers
6 April 2026
Trustindex verifies that the original source of the review is Google.
Absolutely amazing service, always a thorough job and very knowledgable. Really nice guys too. Lee has sorted numerous issues at work and around our house. We have recommended to friends and family who are also very happy
Posted on Google
Alison Molan
25 March 2026
Trustindex verifies that the original source of the review is Google.
Lovely engineers, Matt and Jack, were a pleasure to have in the house. Thorough, knowledgeable, tidy and polite. Would highly recommend.
Commercial EV charging FAQs
Questions about commercial EV charging installation
Common questions about supply capacity, load management and how this service relates to other electrical work.
Will our existing electrical supply need upgrading to add EV charging?
Not always. We assess spare capacity on the incoming supply first, and in many cases dynamic load balancing across the proposed charge points delivers a workable scheme without a supply upgrade. Where spare capacity genuinely is not there, we explain what a DNO application would involve before you commit to it.
Does adding EV charge points mean we need a new distribution board?
Often, yes. A new EV load frequently requires a dedicated way or a board upgrade to accommodate it safely, which we assess alongside the charging scheme itself. See our Distribution Boards page for that specific service if a board upgrade is the main driver.
Do you install domestic EV chargers?
This page covers commercial and workplace installations. Domestic EV charge points for a single dwelling are handled through our residential electrical service — see Residential Electrical for that scope.
When is DC rapid charging appropriate for a commercial site?
Rapid DC charging suits short-dwell locations such as fleet turnaround points, but it draws significantly more from the incoming supply than AC charging and is not usually appropriate for workplace or long-dwell parking. We assess this against your use case rather than assuming rapid charging is always the better option.
Should we install charging for every bay now, or plan for expansion?
That depends on your supply position and budget, but installing containment and spare capacity for future bays at first fix is far cheaper than returning to repeat groundworks later. We typically discuss a phased approach as part of the initial assessment.
Planning EV charging for your car park, fleet or tenants?
Tell us about the number of bays you are considering, the use case, and what you already know about your incoming supply. We can advise on the right approach and arrange a survey where appropriate.